Skip to content
CONFIGLANE

Enterprise networks that survive migrations

Campus, WAN, SD-WAN and wireless: we design target architectures, build them and migrate live sites — planned, tested and signed off on record.

  • HLD & LLD instead of slideware
  • Cutover with rollback plan
  • Rollouts across many sites
  • Sign-off with post-checks

From target picture to sign-off

Network design (HLD / LLD)

Target architecture for campus, WAN and wireless including data model, redundancy concept and bill of materials.

Routing & switching

Catalyst infrastructures, L2/L3 design, OSPF and BGP, first-hop redundancy and QoS — cleanly standardised.

Wireless

Site surveys, controller and Meraki architectures, roaming and security concepts for offices, floors and production.

WAN & SD-WAN

Site connectivity, provider handoffs, SD-WAN overlays and defined failover scenarios.

Site migrations

Staging, cutover plan, wave planning across many sites and a clean way back at every step.

Lifecycle & refresh

Hardware generation changes planned rather than forced: inventory, assessment, migration path.

How we proceed

One project, four stages — each with a defined, verifiable result.

1

Discovery & assessment

Current state captured from devices, controllers and documentation; verified against what is actually configured.

2

Design & alignment

HLD and LLD are developed with your team; decisions are documented, not assumed.

3

Build & migration

Staging, pilot, rollout in waves — every cutover with pre-checks, change window and rollback.

4

Acceptance & handover

Post-checks, acceptance record, operations documentation and a defined transition into operations.

Tooling & platforms

  • Cisco Catalyst
  • Cisco SD-WAN
  • Cisco Meraki
  • OSPF / BGP
  • Wireless / WLC
  • NetBox
  • Cisco pyATS

Next step

Migration coming up?

We examine the starting point and the migration path before you commit — with an assessment that makes inventory, standards and risks reliable.

Request a migration review