Enterprise networks that survive migrations
Campus, WAN, SD-WAN and wireless: we design target architectures, build them and migrate live sites — planned, tested and signed off on record.
- HLD & LLD instead of slideware
- Cutover with rollback plan
- Rollouts across many sites
- Sign-off with post-checks
From target picture to sign-off
Network design (HLD / LLD)
Target architecture for campus, WAN and wireless including data model, redundancy concept and bill of materials.
Routing & switching
Catalyst infrastructures, L2/L3 design, OSPF and BGP, first-hop redundancy and QoS — cleanly standardised.
Wireless
Site surveys, controller and Meraki architectures, roaming and security concepts for offices, floors and production.
WAN & SD-WAN
Site connectivity, provider handoffs, SD-WAN overlays and defined failover scenarios.
Site migrations
Staging, cutover plan, wave planning across many sites and a clean way back at every step.
Lifecycle & refresh
Hardware generation changes planned rather than forced: inventory, assessment, migration path.
How we proceed
One project, four stages — each with a defined, verifiable result.
Discovery & assessment
Current state captured from devices, controllers and documentation; verified against what is actually configured.
Design & alignment
HLD and LLD are developed with your team; decisions are documented, not assumed.
Build & migration
Staging, pilot, rollout in waves — every cutover with pre-checks, change window and rollback.
Acceptance & handover
Post-checks, acceptance record, operations documentation and a defined transition into operations.
Tooling & platforms
- Cisco Catalyst
- Cisco SD-WAN
- Cisco Meraki
- OSPF / BGP
- Wireless / WLC
- NetBox
- Cisco pyATS
Next step
Migration coming up?
We examine the starting point and the migration path before you commit — with an assessment that makes inventory, standards and risks reliable.
Request a migration review